Original framing and back wall

Building the Storage Shed

San Francisco, California

June 2020

Original framing and back wall

Original framing and back wall

With the demolition done, the site is ready for framing.

With the demolition done, the site is ready for framing.

framing the walls

framing the walls

framing the roof

framing the roof

applying plywood sheathing to walls

applying plywood sheathing to walls

applying plywood sheathing to roof

applying plywood sheathing to roof

Applying asphalt shingles

Applying asphalt shingles

view inside left room

view inside left room

view inside right room

view inside right room

Installing the cedar siding

Installing the cedar siding

Building the left barn door

Building the left barn door

IMG_20200703_190541490_HDR.jpg